Region: Puget Sound | Legislative District: 12 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 104,410 | 18,425 | 122,835 |
Right of Way | 0 | 0 | 0 |
Construction | 870,087 | 153,544 | 1,023,631 |
Project Totals | $974,496 | $171,970 | $1,146,466 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
Grind and 2-inch overlay of following segments Ballarat Avenue NE - SE 108th St to NE 8th St Cedar Falls Way - North Bend Way to 436th Ave SE