|
|
||||
Region: Northeast | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 573,475 | 146,397 | 719,872 |
Project Totals | $573,475 | $146,397 | $719,872 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
79.7% | 20.3% | 15% |
grind and 2 inch overlay and upgrade ADA ramps.