Region: Southeast | Legislative District: 15 | Length: 0.00 mi. | FY 2022 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 31,554 | 3,506 | 35,060 |
Right of Way | 0 | 0 | 0 |
Construction | 259,187 | 28,798 | 287,985 |
Project Totals | $290,741 | $32,304 | $323,045 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
This project will plane the roadway and apply crack seal, overlay East Washington between 14th and 18th, and replace the traffic loops, before restriping. The city will fund the ADA ramps on their own.