Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/30/2024 Payment 0.00 0.00 44,347.60 0.00 0.00 0.00 0.00 44,347.60
2 10/04/2024 Payment 0.00 0.00 12,854.03 0.00 0.00 0.00 0.00 12,854.03
3 11/14/2024 Audit 0.00 0.00 -14,800.42 0.00 30,547.11 0.00 205,843.68 221,590.37
TOTAL PAYMENTS 0.00 0.00 42,401.21 0.00 30,547.11 0.00 205,843.68 278,792.00