Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/28/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 347,073.00 347,073.00
2 01/31/2024 Audit 0.00 0.00 4,802.24 0.00 9,870.92 0.00 49,004.84 63,678.00
TOTAL PAYMENTS 0.00 0.00 4,802.24 0.00 9,870.92 0.00 396,077.84 410,751.00