Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/12/2020 Payment 0.00 0.00 6,128.39 0.00 0.00 0.00 0.00 6,128.39
2 09/29/2020 Payment 0.00 0.00 1,444.50 0.00 0.00 0.00 0.00 1,444.50
3 11/18/2020 Payment 0.00 0.00 6,948.18 0.00 0.00 0.00 0.00 6,948.18
4 12/30/2020 Payment 0.00 0.00 3,744.57 0.00 0.00 0.00 0.00 3,744.57
5 04/15/2022 Audit 0.00 0.00 384.04 0.00 17,441.75 0.00 100,510.57 118,336.36
TOTAL PAYMENTS 0.00 0.00 18,649.68 0.00 17,441.75 0.00 100,510.57 136,602.00