Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/13/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 140,641.00 140,641.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 140,641.00 140,641.00