Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/31/2019 Audit 0.00 0.00 0.00 0.00 0.00 0.00 23,763.00 23,763.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 23,763.00 23,763.00