Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/01/2021 Audit 0.00 0.00 6,644.43 0.00 2,813.84 0.00 91,281.73 100,740.00
TOTAL PAYMENTS 0.00 0.00 6,644.43 0.00 2,813.84 0.00 91,281.73 100,740.00