Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 06/21/2019 Payment 0.00 0.00 1,702.33 0.00 0.00 0.00 274,027.20 275,729.53
2 07/22/2019 Payment 0.00 0.00 0.00 0.00 0.00 0.00 39,548.69 39,548.69
3 12/02/2019 Audit 0.00 0.00 -18.41 0.00 0.00 0.00 12,921.19 12,902.78
TOTAL PAYMENTS 0.00 0.00 1,683.92 0.00 0.00 0.00 326,497.08 328,181.00