Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/15/2016 Audit 0.00 0.00 0.00 0.00 1,378.00 0.00 27,556.00 28,934.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 1,378.00 0.00 27,556.00 28,934.00