Bill # | Payment Date | Type | Predesign | Spec. Study | DE Engr. | Right of Way | CN Engr. | CN Other | CN Contract | Total |
---|---|---|---|---|---|---|---|---|---|---|
1 | 12/15/2016 | Audit | 0.00 | 0.00 | 0.00 | 0.00 | 1,378.00 | 0.00 | 27,556.00 | 28,934.00 |
TOTAL PAYMENTS | 0.00 | 0.00 | 0.00 | 0.00 | 1,378.00 | 0.00 | 27,556.00 | 28,934.00 |