Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/17/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 105,849.40 105,849.40
2 12/13/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 7,538.40 7,538.40
3 01/31/2024 Audit 0.00 0.00 2,650.00 0.00 4,085.00 0.00 0.20 6,735.20
TOTAL PAYMENTS 0.00 0.00 2,650.00 0.00 4,085.00 0.00 113,388.00 120,123.00