Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/21/2017 Payment 0.00 0.00 0.00 0.00 0.00 0.00 27,681.39 27,681.39
2 12/27/2017 Audit 0.00 0.00 0.00 0.00 0.00 0.00 173.61 173.61
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 27,855.00 27,855.00