Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/01/2021 Audit 0.00 0.00 11,893.82 0.00 6,175.87 0.00 57,990.31 76,060.00
TOTAL PAYMENTS 0.00 0.00 11,893.82 0.00 6,175.87 0.00 57,990.31 76,060.00