Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/03/2024 Payment 0.00 0.00 33,126.37 0.00 0.00 0.00 463,141.65 496,268.02
2 11/26/2024 Payment 0.00 0.00 0.00 0.00 19,815.00 0.00 39,666.98 59,481.98
3 12/13/2024 Audit 0.00 0.00 1,873.63 0.00 5,185.00 0.00 62,654.37 69,713.00
TOTAL PAYMENTS 0.00 0.00 35,000.00 0.00 25,000.00 0.00 565,463.00 625,463.00