Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/15/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 265,840.00 265,840.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 265,840.00 265,840.00