Bill # | Payment Date | Type | Predesign | Spec. Study | DE Engr. | Right of Way | CN Engr. | CN Other | CN Contract | Total |
---|---|---|---|---|---|---|---|---|---|---|
1 | 10/15/2014 | Audit | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 18,712.15 | 47,844.85 | 66,557.00 |
TOTAL PAYMENTS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 18,712.15 | 47,844.85 | 66,557.00 |