Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/04/2008 Audit 0.00 0.00 0.00 0.00 2,447.02 0.00 26,286.20 28,733.22
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 2,447.02 0.00 26,286.20 28,733.22