Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/20/2007 Audit 0.00 0.00 140.00 0.00 0.00 0.00 22,052.00 22,192.00
TOTAL PAYMENTS 0.00 0.00 140.00 0.00 0.00 0.00 22,052.00 22,192.00