Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 01/01/2009 Audit 0.00 0.00 650.80 0.00 1,211.72 0.00 112,985.55 114,848.07
TOTAL PAYMENTS 0.00 0.00 650.80 0.00 1,211.72 0.00 112,985.55 114,848.07