Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/20/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 5,773.20 5,773.20
2 11/13/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 9,728.76 9,728.76
3 12/11/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 23,078.55 23,078.55
4 08/11/2009 Audit 0.00 0.00 0.00 0.00 0.00 0.00 47,669.49 47,669.49
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 86,250.00 86,250.00