Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 06/05/2018 Payment 0.00 0.00 0.00 0.00 0.00 0.00 25,291.16 25,291.16
2 06/25/2018 Payment 0.00 0.00 0.00 0.00 0.00 0.00 4,840.38 4,840.38
3 01/10/2019 Audit 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 30,131.54 30,131.54