Bill # | Payment Date | Type | Predesign | Spec. Study | DE Engr. | Right of Way | CN Engr. | CN Other | CN Contract | Total |
---|---|---|---|---|---|---|---|---|---|---|
1 | 10/02/2017 | Audit | 0.00 | 0.00 | 0.00 | 0.00 | 200.95 | 0.00 | 12,271.05 | 12,472.00 |
TOTAL PAYMENTS | 0.00 | 0.00 | 0.00 | 0.00 | 200.95 | 0.00 | 12,271.05 | 12,472.00 |