Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/03/2020 Audit 0.00 0.00 0.00 0.00 7,606.81 0.00 83,483.19 91,090.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 7,606.81 0.00 83,483.19 91,090.00