Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/17/2014 Payment 0.00 0.00 0.00 0.00 3,900.54 0.00 47.50 3,948.04
2 11/03/2014 Payment 0.00 0.00 0.00 0.00 2,563.22 0.00 112,575.78 115,139.00
3 01/09/2015 Payment 0.00 0.00 0.00 0.00 508.07 0.00 4,682.53 5,190.60
4 02/02/2015 Audit 0.00 0.00 0.00 0.00 -411.12 523.88 4,987.60 5,100.36
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 6,560.71 523.88 122,293.41 129,378.00