Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/10/2014 Payment 0.00 0.00 0.00 0.00 0.00 0.00 109,880.32 109,880.32
2 03/02/2015 Audit 0.00 0.00 8,674.46 0.00 791.33 0.00 -3,748.11 5,717.68
TOTAL PAYMENTS 0.00 0.00 8,674.46 0.00 791.33 0.00 106,132.21 115,598.00