Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/01/2009 Audit 0.00 0.00 0.00 0.00 3,054.01 0.00 104,019.32 107,073.33
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 3,054.01 0.00 104,019.32 107,073.33