Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/19/2007 Audit 0.00 0.00 1,000.00 0.00 3,000.00 0.00 36,654.00 40,654.00
TOTAL PAYMENTS 0.00 0.00 1,000.00 0.00 3,000.00 0.00 36,654.00 40,654.00