Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/16/2019 Payment 0.00 0.00 0.00 0.00 0.00 0.00 62,107.17 62,107.17
2 11/13/2019 Payment 0.00 0.00 0.00 0.00 0.00 0.00 1,470.87 1,470.87
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 63,578.04 63,578.04