Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/18/2013 Payment 0.00 0.00 8,793.78 0.00 0.00 0.00 0.00 8,793.78
2 03/13/2014 Payment 0.00 0.00 7,754.39 0.00 0.00 0.00 0.00 7,754.39
3 07/15/2014 Audit 0.00 0.00 6,544.83 0.00 14,340.00 0.00 94,459.00 115,343.83
4 06/12/2015 Audit 0.00 0.00 0.00 0.00 -230.00 0.00 0.00 -230.00
TOTAL PAYMENTS 0.00 0.00 23,093.00 0.00 14,110.00 0.00 94,459.00 131,662.00