Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/21/2020 Payment 0.00 0.00 0.00 0.00 11,880.04 0.00 0.00 11,880.04
2 08/25/2020 Payment 0.00 0.00 0.00 0.00 4,567.90 0.00 0.00 4,567.90
3 11/17/2020 Payment 0.00 0.00 0.00 0.00 0.00 0.00 158,511.10 158,511.10
4 01/26/2021 Payment 0.00 0.00 0.00 0.00 0.00 0.00 6,313.45 6,313.45
5 05/03/2021 Audit 0.00 0.00 12,312.92 0.00 -5,393.76 0.00 -4,488.65 2,430.51
TOTAL PAYMENTS 0.00 0.00 12,312.92 0.00 11,054.18 0.00 160,335.90 183,703.00