Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/28/2008 Payment 0.00 0.00 3,044.14 0.00 0.00 0.00 0.00 3,044.14
2 09/08/2008 Audit 0.00 0.00 2,568.64 0.00 0.00 0.00 94,387.22 96,955.86
TOTAL PAYMENTS 0.00 0.00 5,612.78 0.00 0.00 0.00 94,387.22 100,000.00