Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/01/2021 Audit 0.00 0.00 2,667.39 0.00 1,704.01 1,727.08 93,743.52 99,842.00
TOTAL PAYMENTS 0.00 0.00 2,667.39 0.00 1,704.01 1,727.08 93,743.52 99,842.00