Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/31/2020 Audit 0.00 0.00 1,547.00 0.00 2,343.82 0.00 99,193.18 103,084.00
TOTAL PAYMENTS 0.00 0.00 1,547.00 0.00 2,343.82 0.00 99,193.18 103,084.00