Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/15/2020 Audit 0.00 0.00 2,741.25 0.00 1,626.90 1,951.60 73,313.25 79,633.00
TOTAL PAYMENTS 0.00 0.00 2,741.25 0.00 1,626.90 1,951.60 73,313.25 79,633.00