Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/22/2020 Payment 0.00 0.00 3,342.00 0.00 0.00 0.00 0.00 3,342.00
2 01/20/2021 Payment 0.00 0.00 276.70 0.00 0.00 0.00 0.00 276.70
3 03/15/2022 Audit 0.00 0.00 -3,618.70 0.00 3,618.71 0.00 70,103.29 70,103.30
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 3,618.71 0.00 70,103.29 73,722.00