Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/29/2020 Audit 0.00 0.00 18,407.85 0.00 14,005.62 0.00 98,289.53 130,703.00
TOTAL PAYMENTS 0.00 0.00 18,407.85 0.00 14,005.62 0.00 98,289.53 130,703.00