Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/03/2019 Audit 0.00 0.00 24,436.30 0.00 24,436.30 0.00 260,034.40 308,907.00
TOTAL PAYMENTS 0.00 0.00 24,436.30 0.00 24,436.30 0.00 260,034.40 308,907.00