Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/25/2009 Payment 0.00 0.00 0.00 0.00 0.00 0.00 43,855.69 43,855.69
2 11/15/2009 Audit 0.00 3,771.81 0.00 0.00 5,593.43 0.00 56,069.47 65,434.71
TOTAL PAYMENTS 0.00 3,771.81 0.00 0.00 5,593.43 0.00 99,925.16 109,290.40