Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/16/2019 Audit 0.00 0.00 0.00 0.00 0.00 123.15 45,666.85 45,790.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 123.15 45,666.85 45,790.00