Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/23/2024 Payment 0.00 0.00 0.00 0.00 0.00 540,756.41 0.00 540,756.41
2 12/06/2024 Payment 0.00 0.00 0.00 0.00 11,553.34 0.00 130,903.93 142,457.27
3 04/01/2025 Audit 0.00 0.00 35,407.45 0.00 -4,024.59 -480,687.91 471,148.37 21,843.32
TOTAL PAYMENTS 0.00 0.00 35,407.45 0.00 7,528.75 60,068.50 602,052.30 705,057.00