Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/23/2024 Payment 0.00 0.00 0.00 0.00 0.00 3,754.42 101,784.58 105,539.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 3,754.42 101,784.58 105,539.00