Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/19/2007 Audit 0.00 0.00 0.00 0.00 0.00 0.00 14,131.00 14,131.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 14,131.00 14,131.00