Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/15/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 51,407.00 51,407.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 51,407.00 51,407.00