Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/13/2025 Payment 0.00 0.00 22,943.38 0.00 0.00 0.00 0.00 22,943.38
2 03/12/2025 Payment 0.00 0.00 12,514.57 0.00 0.00 0.00 0.00 12,514.57
3 04/14/2025 Payment 0.00 0.00 4,171.52 0.00 0.00 0.00 0.00 4,171.52
TOTAL PAYMENTS 0.00 0.00 39,629.47 0.00 0.00 0.00 0.00 39,629.47