Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/16/2024 Payment 0.00 0.00 14,993.62 0.00 53,013.20 0.00 485,512.41 553,519.23
2 03/17/2025 Audit 0.00 0.00 6.38 0.00 9,442.80 0.00 -0.41 9,448.77
TOTAL PAYMENTS 0.00 0.00 15,000.00 0.00 62,456.00 0.00 485,512.00 562,968.00