Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 06/13/2011 Payment 0.00 0.00 11,072.01 0.00 0.00 0.00 0.00 11,072.01
2 07/21/2011 Payment 0.00 0.00 4,712.09 0.00 0.00 0.00 0.00 4,712.09
3 11/17/2011 Payment 0.00 0.00 1,755.14 0.00 0.00 0.00 90,470.69 92,225.83
4 01/25/2012 Audit 0.00 0.00 -17,539.24 0.00 18,326.00 0.00 4,761.31 5,548.07
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 18,326.00 0.00 95,232.00 113,558.00