Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/09/2013 Payment 0.00 0.00 0.00 0.00 7,750.81 0.00 0.00 7,750.81
2 10/09/2013 Payment 0.00 0.00 0.00 0.00 6,691.51 0.00 78,914.71 85,606.22
3 01/15/2014 Audit 0.00 0.00 7,928.98 0.00 -6,513.34 0.00 4,153.33 5,568.97
TOTAL PAYMENTS 0.00 0.00 7,928.98 0.00 7,928.98 0.00 83,068.04 98,926.00