Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/28/2020 Payment 0.00 0.00 0.00 0.00 0.00 0.00 15,050.49 15,050.49
2 12/31/2020 Audit 0.00 0.00 0.00 0.00 394.00 0.00 26,408.51 26,802.51
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 394.00 0.00 41,459.00 41,853.00