Bill # | Payment Date | Type | Predesign | Spec. Study | DE Engr. | Right of Way | CN Engr. | CN Other | CN Contract | Total |
---|---|---|---|---|---|---|---|---|---|---|
1 | 08/01/2013 | Audit | 0.00 | 0.00 | 16,693.00 | 0.00 | 0.00 | 0.00 | 43,945.00 | 60,638.00 |
TOTAL PAYMENTS | 0.00 | 0.00 | 16,693.00 | 0.00 | 0.00 | 0.00 | 43,945.00 | 60,638.00 |